VoronUsers/printer_mods/Ch4rlesB/V0_Handles_Slim
CharlesB 5815b7fa9b
Handles slim v2 (#356)
* Create README.md

* Added Stls and Screenshots

* Updated the README

* Update README.md

* Typo

* Updated Link to images

* Typo again

* Delete V0_Handles_Slim_3_Panel.stl

Removed Unadjusted 3mm File

* Delete V0_Handles_Slim_2.5_Panel.stl

Removed Unadjusted 2.5mm file

* Added Adjusted stls

* Delete V0_Handles_Slim_2.5_Panel_x2.stl

* Delete V0_Handles_Slim_3_Panel_x2.stl

* Add files via upload

Reduced the protruding piece that fits in extrusion down to 1mm.

* Update README.md

Added instructions to the README.md

* Delete V0_Handles_Slim_2.5_Panel_x2.stl

* Delete V0_Handles_Slim_3_Panel_x2.stl

* V2 commit

* Delete V0_Handles_Slim_2.5_Panel_x2.stl

* Delete V0_Handles_Slim_3_Panel_x2.stl

* Delete V0_Handles_Slim_2.5_Panel_V2_x2.stl

* Delete V0_Handles_Slim_3_Panel_V2_x2.stl

* Add files via upload
2021-06-28 08:25:01 -04:00
..
README.md Handles slim v2 (#356) 2021-06-28 08:25:01 -04:00
Screenshot1.png V0_Handles_Slim (#337) 2021-06-06 19:15:00 -04:00
Screenshot2.png V0_Handles_Slim (#337) 2021-06-06 19:15:00 -04:00
Screenshot3.png V0_Handles_Slim (#337) 2021-06-06 19:15:00 -04:00
V0_Handles_Slim_2.5_Panel_x2.stl Handles slim v2 (#356) 2021-06-28 08:25:01 -04:00
V0_Handles_Slim_3_Panel_x2.stl Handles slim v2 (#356) 2021-06-28 08:25:01 -04:00

README.md

V0 Handles Slim

Screenshot1.png

My V0 is in my garage and my shop in the other room. Moving it back and forth for repairs was a pain as the V0.1 has no real place to grab it.

And so I made handles that don't protrude much from the sides (16mm) of the tophat keeping the footprint as close to stock as possible.

To mount:

  • 4x M3x12 (8 for both sides)
  • 3x M3 Nut (6 for both sides)

Print two of the file that fits your side panel thickness

  • 2.5mm
  • 3mm

You will have to add 3 nuts to the top extrusions as the handle replaces the top panel clip and requires 4 nuts (3 new + 1 old from panel clip)

  1. Remove the middle clip on the top extrusions but keep the nut in place.
  2. Unscrew both screws that hold the top right and left extrusions in place.
  3. Lift the extrusions just enough to be able to add 3 nuts in the outward channels.
  4. Seat the extrusions back into place and tighten the screws holding them in place.
  5. Reuse the existing nut (old panel clip) and the 3 new nuts to attach handle.

Screenshot2.png Screenshot3.png